  • Study of the calculated indicators of approval of the project of the device of engineering networks in JSC "Mosvodokanal"

    The article deals with modern problems in the field of coordination of working documentation, due to the lack of regulatory documentation that regulates the clear time allotted for the preparation and approval of the developed documentation. The main goal is to obtain averaged time indicators based on the data of standard projects of objects, as well as to determine the degree of mutual influence of factors on the considered terms, in order to apply them in the preparation of a consolidated calendar plan of the organization provided to the technical customer for the conclusion of the contract, as well as to predict and reduce time indicators for the removal of comments and repeated requests.

    Keywords: matching, matching organizations, average labor intensity, repeated requests, correlation and regression analysis

  • Drilling in permafrost conditions using gas-liquid systems

    The problem of drilling in permafrost conditions still remains relevant. Despite significant progress using thermal insulating casing directions, the issue of choosing a drilling fluid remains controversial, since an incorrectly selected drilling fluid can lead to huge consequences. This article provides a brief description of permafrost, discusses the problems of drilling in permafrost conditions, and methods for their solution using gas-liquid systems, and air.

    Keywords: drilling, permafrost, gas-liquid systems, air drilling

  • Identification of averaged time parameters for the passage of procedures at the stage of pre-design and design preparation of an object for construction

    The purpose of the study is to identify the average time parameters of the passage of procedures at the stage of pre-design and design preparation of the facility for construction. Determining the actual time spent on going through the procedures required to obtain a building permit is relevant at the present stage, since their passage is accompanied by huge time and financial costs for investors, developers, technical customers. The research is based on the method of expert assessments. The processing of the obtained data sets was carried out according to the following algorithm: correlation analysis, construction and solution of the linear regression equation, assessment of the quality of the regression equation using Fisher's F-criterion, conclusion. The processing of arrays of data from the questionnaire survey of experts made it possible to determine the average time intervals for the passage of procedures by a technical customer (developer) at the stages under study. The results for all considered procedures were summarized in a summary table. The obtained averaged time intervals will allow developers, investors, technical customers to determine the duration of implementation and rationally allocate labor and financial resources at the stages of pre-design and design preparation of facilities for construction.

    Keywords: technical customer, developer, pre-design and design preparation, time intervals

  • Organizational and technological methods of installing flat arches and window boards in window openings of brick walls

    Organizational and technological installation operations for flat arches and window boards in the window openings of brick buildings are developed based on innovative modern buildings, on economically justified methods of work production. It is proposed domestic technical rigging, tools, means of performed works quality control taking into account the solution of import substitution problem while works production. Regions of the Russian Federation having clay and sand as local materials for bricks production prefer to use the bricks in low-rise buildings construction. It is emphasized a need to resume the use of standard projects for construction of residential low-rise buildings, cultural, recreational, educational, sports, medical and commercial buildings made of brick as a local building material. One gives the algorithm of the construction process: storage on construction site, workplace supply and erection (installation) of flat arches and window boards in window openings of brick walls. The article describes in detail construction process organizational and technological solutions and techniques. General instructions on the safety of work, as well as the organization and methods of workers labor are given. The possibility of construction time reducing by typifying the low-rise buildings construction, including those made of bricks, using locally available construction materials is shown. The article shows the efficiency of use of labor resources and construction materials supply from storage site to installation spot, considering the correct assembled elements installation provision.

    Keywords: flat arch, window board, window opening, brick, brick element, mason, installer, workplace, rigging, crane

  • On the issue of solving the tasks of countering illegal construction by the State construction supervision bodies

    In this article, the authors present the prospects and methods of countering illegal construction on the example of the work of one of the departments of state control and supervisory activities. Shows the statistics on the number of detected violations in the field of control and supervision activities for the period 2018-2019 in the number of detected illegal buildings and the prospects of mitigating these offences on the example of one of the divisions of the state construction supervision. The list of measures for the elimination of illegal buildings, as well as the list of grounds for these inspections, is presented. In the article, the authors present conclusions on the results of the activities of the State Construction Supervision division, taking into account the changes made to the Civil Code of the Russian Federation.

    Keywords: technical supervision, construction control, control and supervisory activities, construction production technology, construction organization, unauthorized construction, illegal construction

  • Organizational and technological problems and development prospects of underground construction

    The article is devoted to the importance and relevance of the development of underground space, today in large cities there is an acute shortage of areas free from development, as well as the high traffic congestion with personal cars, these and many other problems can be solved through the integrated development of underground space. The classification of underground structures is given. The organizational and technical problems of construction below the zero cycle are indicated. Examples of competent use of underground space in the world are considered. Benefits of construction below zero cycle are also noted. The objects, the construction of which is promising underground, are described. Attention is drawn to the climatic and anthropogenic factors taken into account during construction. In conclusion, the measures that need to be taken for the development of the underground space of our cities are considered.

    Keywords: development of underground space urban studies, organization of construction of underground structures, urban space, cramped urban development, organizational and technical problems

  • Analysis of the scope of project management of construction activities

    The article presents an analysis of project management in terms of the construction industry. The specific features of the management of production activities of construction enterprises have been studied and the effectiveness of this management has been determined. The main problems in the field of project management of construction activities are identified, the main of which is the absence in Russian legislation of a single normative act regulating the development and implementation of a project only in the construction sector. The project management methodology was also considered, using the example of the American methods PMBOK and PRINCE2. The authors analyzed the statistical data of domestic companies involved in the development and management of projects in various industries. The results of the study showed that Russian construction companies are not actively involved in project management compared to organizations in other areas of activity.

    Keywords: project management, construction companies, project management methodology, production activities, legislation, monitoring

  • The choice of energy-efficient technological processes in the reconstruction of buildings of universities

    The article substantiates the relevance of the reconstruction of buildings of higher educational institutions (hereinafter referred to as higher educational institutions), presents an algorithm for choosing technological processes that should be carried out during the reconstruction of buildings of higher educational institutions and contribute to energy conservation and energy efficiency. It also reflects a practical presentation of the algorithm, which resulted in a list of technological processes for the reconstruction of buildings of universities, taking into account the use of energy-saving measures.

    Keywords: technological process, reconstruction, university building, energy saving measure, energy saving, increasing energy efficiency, classification of energy saving measures, building structure, structural diagram of a building, structural element

  • The choice of energy-efficient technological processes in the reconstruction of buildings of universities

    Organizational and technological modeling as applied to the processes of reconstruction of buildings of higher education institutions is based on the division of models into structural and functional components - a model of the spatial and technological structure and a functional model of the process of reconstruction of a building of higher education institutions. The article discusses the organization of the work site with the technological sequence of the flow of work processes. Taking this into account, graphs of works were compiled by stages, showing the possibility of parallel production of works, as well as showing the necessary work preceding them. Based on this, a conclusion was made about the effectiveness of the application of the methodology of organizational and technical modeling to increase organizational efficiency.

    Keywords: technological process, reconstruction, university building, resource and technological module, energy saving, energy efficiency increase, structural element, network schedule, digraph, work operation

  • Social significance of the construction of preschool educational institutions

    The article shows the dynamics of the birth rate in the period from 1995-2020.. The social significance of the construction of a preschool educational institution is considered. Its role in the formation of the child as a person and part of society is analyzed.

    Keywords: children's preschool educational institution, construction, children, development, modern, formation, formation, equipment

  • Regeneration of a unique industrial environment in world and Russian practice

    The article analyzes the practical experience of regenerating the unique industrial environment of the industrial territories of large cities in Russia and Europe. The main methods of regeneration of a unique industrial environment are considered, depending on the degree of preservation of industrial function.

    Keywords: regeneration, unique industrial environment, urban environment, industrial heritage, development of territories

  • Development of software product for assessment of low-cycle life by crack origin criterion

    One of the current tasks of operation of the linear part of the main pipelines is an adequate assessment of the degree of risk of pipe defects. There are several approaches to its solution and a set of calculation methods that take into account the specifics of the operation of main oil and gas pipelines. One of the main performance criteria of pipelines is their durability. The article describes a developed software product that allows you to automate the calculation of the maximum service life of a pipeline with a defect according to the chosen method.

    Keywords: main pipelines, reliability, defects, strength, durability, program, calculation method, service life

  • Problems of technical maintenance and reconstruction of health facilities on the example of the city of Rostov-on-Don

    The article is devoted about the importance and urgency of the problem of reconstruction of healthcare facilities, since hospitals, like other forms of ownership, accumulate moral and physical deterioration and need periodic repairs or full-scale reconstruction. In our country, it is not uncommon for a hospital to be a dilapidated building whose service life is coming to an end. That is why in our days the issue of full-scale reconstruction of healthcare facilities is so acute. The Ministry of Health of the Russian Federation has developed a number of measures, thanks to which, according to Rosstat, more than 10 thousand hospitals will be repaired by 2024. The authors of the article make a comprehensive assessment of maternity hospitals in Rostov-on-Don, show their layout and fertility chart. The following is an example of the reconstruction of the observational building of the MBUZ. In the conclusion, the results are summed up and the measures that need to be taken for the comfortable stay of people in the hospitals of our country are determined.

    Keywords: reconstruction, healthcare, operation, buildings of medical institutions

  • Strategic planning in a construction organization

    The essence of strategic planning is revealed. The importance of strategic planning in construction is proved. The stages of strategic planning are briefly described. The strategic planning procedure is described. The stages of implementing the strategic plan are outlined.

    Keywords: strategic planning, organization, construction, resources, financing, development, modeling, expert, implementation, information

  • Technical criteria for choosing an excavator for pit development

    Information modeling of construction processes should be attributed to the actual problems of development of technology and organization of construction. An important part of the information model is the geometric description of the technological sites (excavator faces). When designing technological sites (faces) of excavators, it is recommended to use the maximum digging radius on the ground surface as a criterion, taking into account the conditions of work (types of soil). To calculate the minimum value of the digging radius, a mathematical expression is proposed, which contains a complex indicator describing the physical and mechanical characteristics of the soil (tga). The results obtained allow us to cut off earthmoving machines at the decision-making stage by the size of the maximum digging radius on the earth's surface. These results describe the first step in the information modeling of the process of excavation by an excavator.

    Keywords: excavator, technological parking, digging radius, slope angle of the ground slope, geometric dimensions of the face, pit, distance from the edge of the bottom of the pit to the excavator support, information model, productivity, robotization

  • Economic lifetime of light sources in greenhouse vegetable growing

    Currently, high pressure sodium lamps are the light source in greenhouse vegetable growing. The most promising sources of artificial lighting are LED-based irradiators. They can provide a cooler temperature environment to bring plants closer to plants. The aim of the study is to determine the economic life of sodium and LED light sources in greenhouse vegetable growing, taking into account their degradation for the harvest. LEDs, like sodium lamps, degrade during use. This leads to a decrease in the light (photosynthetic photon) flux of light sources and, as a result, to a decrease in yield. Due to this certain functional dependence on the luminous flux level, the economically feasible life of the light is predicted.

    Keywords: light sources, luminous flux, LED lamps, sodium lamps, productivity, energy efficiency, economy

  • Implementation of construction control using building information modeling and virtual reality technologies

    Against the background of the explosive development of modern technologies and methods of construction, the use of innovative structural materials, the growing volume of information about construction production, the complexity and uniqueness of projects, and given the low tendency for retraining of personnel and the insufficient competence of the labor force involved in the production of work, the issue of the quality of construction assembly work (CMP). The applied methods of organizing construction control according to the existing and slightly modified methods of the 80-90s of the XX century do not provide the necessary level of control of construction and installation work. Given the relevance of this problem, the question arises of the need to ensure high-quality and effective construction control to exclude the facts of violation of the production technology, prevent a decrease in the operational characteristics of the building, minimize the cost of eliminating errors, etc. Using comparative, statistical methods of research, analysis and modeling of mechanisms used by engineers of construction control of Russian and foreign construction organizations, the need for implementation was justified and a method of construction control based on modern achievements in engineering and technology was proposed, in particular, the use of building information modeling (BIM) and virtual reality (Virtual Reality, VR) technologies in the relationship, which allows to increase the efficiency of construction production and control, optimize the time for analysis and management decision-making, reduce the likelihood of violations on construction sites that affect the implementation period, cost and quality of the project.

    Keywords: construction control, building information modeling (BIM) technologies, virtual reality (VR), construction project life cycle, 3D-model

  • Improvement of methodological approaches to the management of organizational and technological design in construction

    This article describes the methods used to improve the management of construction design; the difference between the traditional and modern method, the problems encountered by the design at the time of execution, their consequences but also the importance of modeling building information and automating design processes as an effective method of improving organizational and technological management processes of designing a residential building.

    Keywords: construction design, collaboration, cooperation, coordination, design processes, design managers, improvement, productive, controlling, quality, asynchronous, synchronous

  • Methodology for improving the quality of management with an integrated project delivery of the construction projects

    The negative trends in the country's economy associated with the COVID-19 pandemic have also affected the construction industry of the Russian Federation. The impossibility of transferring construction to a remote mode, the suspension of the work of construction companies affected their financial activities. In addition to government support, construction companies must independently seek ways to improve their performance. One of the ways to improve the quality of management in the implementation of investment and construction projects is to use the approach of integrated project implementation. Within the framework of this approach, it is necessary to focus on quality management at all stages of the life cycle. It is proposed to use this approach in conjunction with the methods of business information modeling technology for projects.

    Keywords: Integrated Project Delivery, lean construction, business information modeling

  • A systematic approach to the mulcher machine power selection for the forest area preparation and combating forest fires

    The use of mulcher machines is a promisingmethod of preventing and combating forest fires. Whenpreparing forest areas with the use of mulcher machines the soil is crushed altogether with the vegetation growing on the surface, roots and otherwood inclusions, while the process of interaction of the working body with the soil requires significant energy costs. The analysis of the mulcher operating modes with a working body in the form of a drum-chopper has been carried out and, as the result, the operating modes of the mulcher machine have been determined. The mulcher machine operation mode when cutting woody vegetation has been examined. A computer program has been developed to determine the rational parameters and operating modes of the mulcher machine.

    Keywords: drum-chopper, combating forest fires, mulcher machine, wood vegetation cutting

  • Generalization of modern directions of choice of organizational technical decisions at the construction of buildings

    In the article are considered the methodic of search of the best from the point of view of the criteria given of organizational technical decisions in the construction process. This methodic for decision of building production tasks has been worked out or is being worked out in different institutes of Russian Federation. In the paper some of possible methodic of choice on the ground of automation and mechanization means are analyzed. We should outline the three basic methods of accepting of decision about the way of performance of construction works: a) brainstorming of engineers, really involved in taking of decisions; b) analytic approach, realization of choice of the way of performance of construction and installation works by means of exploration of the problem of search of "optimal in the given conditions decision"; c) mathematic modeling, using of the technology of informational modeling of buildings (BIM) as a part of computer-aided design (CAD).

    Keywords: organizational and technological solutions, building information modeling (BIM), mathematical methods, network model, construction process, technological map

  • Disadvantages of the building information model at all stages of its life and ways to minimize their impact

    With information modeling of buildings, the time and money spent on creating a building project is significantly minimized, and it also becomes possible to make changes to the project, reducing the likelihood of a designer making a mistake. However, building information models have a number of disadvantages expressed at each stage of the object's life cycle. In this article, the main stages of the life cycle of a building were highlighted, according to regulatory documents. The drawbacks of using information models at each stage are highlighted and their influence on the work in the information modeling environment is considered. Ways to minimize these shortcomings, taking into account the prevalence of BIM-models of the building at the present time, are proposed. The general problems of transition from the classical design method to information models are highlighted.

    Keywords: Infromation model, BIM, lifecycle of building, building, projecting

  • Simulation of the design activity diversification of innovative enterprise

    The main maintenance of a diversification of production as activity of subjects of managing is considered. being shown in purchase of the operating enterprises, the organizations of the new enterprises, redistribution of investments in interests of the organization and development of new production on available floor spaces. The most important organizational economic targets of a diversification of management are presented by innovative activity of the industrial enterprise.

    Keywords: diversification of management, production diversification, financial and economic purposes of a diversification, technological purposes of ensuring flexibility of production

  • Improving the energy efficiency of lighting systems in state (municipal) institutions

    On November 10, 2017, new requirements came into force that apply to lighting devices and electric lamps used in AC circuits. In connection with the newly introduced requirements, calculations of power consumption in educational institutions were carried out at different times of use of the lighting load. The purpose of the research is to determine the payback period for the implementation of LED lamps instead of fluorescent lamps for various types of premises in educational institutions. The analysis of technical characteristics of LED light sources offered on the market of the Russian Federation is carried out. Based on the results of the calculations, the payback periods were obtained for the introduction of LED lamps instead of fluorescent lamps for public premises, laboratories, training workshops, as well as lecture halls of educational institutions, with different times of use of the lighting load. This can allow already at the design stage to evaluate the effectiveness of the implementation of the selected light sources.

    Keywords: light sources, led lamps, fluorescent lamps energy efficiency, electric lamps, lighting systems, educational institutions

  • Justification of the expediency of using a vibro-vacuum unit when cleaning adjoining territories in Tyumen

    A device for compacting the snow mass using the vibro-vacuum compaction method has been designed. Calculations were made in the SolidWorks 2018 software product. The calculation of the estimated economic efficiency of compaction of the snow mass using vibro-vacuum compaction was carried out.

    Keywords: cleaning of the adjacent territory, vibration-vacuum compaction, installation, calculation of economic efficiency